ZERO SUPRISES ON SITE.

Digital Factory Acceptance Testing (FAT) with AH-Suite™

No more manual checklists or “commissioning surprises.” Digitally verify every cell, signal, and logic gate of your Battery Energy Storage System from the factory floor. AmpereHour’s AH-Suite™ replaces paper-based sampling with automated validation, 100% traceability, and real-time cloud visibility.

THE DIGITAL EVOLUTION

What is Unified Digital FAT with AH-Suite?

Digital FAT using AH-Suite is a fully automated factory acceptance testing for battery energy storage systems. It verifies the performance, safety logic, and system communication before the battery system is shipped.

Instead of relying on manual, checklist-based testing and paper reporting systems, it automates testing protocols, digitally validates every component and records every result in the cloud. AH-Suite connects your engineering team directly to the manufacturing floor.

The Digital Shield

Pre-shipment verification of performance, safety, and connectivity.

The Cloud Pulse (Connectivity Focus)

100% component tracebility via automated real-time cloud logging.

 How it Works?

Digital Test Plan

Your technical parameters are automated into digital checklists on AH-Suite.

On-Site Engineering Oversight

AmpereHour engineers verify the bill of materials (BOM) and all mechanical compliance.

Automated System Testing

Charge and discharge cycling, with safety triggers, signal validation, and thermal behavior are digitally tested.

Cloud Validation Dashboard

All test data is uploaded live to AH-Suite for remote visibility.

Shipment Approval

Your team signs off only after performance results are verified.

We don’t just "witness" the test. We digitize it.

AmpereHour replaces the clipboard with AH-Suite, a proprietary digital platform that connects your engineering team directly to the manufacturing floor. AH-Suite ensures:

100% Traceability

It digitally validates 100% of signals, cells, and modules. AH-Suite tracks each serial number and logs every result in the cloud.

Boots on the Ground

Our dedicated AHE Engineering Team is physically present at the factory, ensuring strict adherence to the Bill of Materials (BOM) and IEC standards on-site.

End-to-End Validation

Our digital protocol verifies performance, safety logic and dispatch readiness, ensuring the software works before the hardware leaves.

Traditional FAT vs AH Digitalized FAT

Feature Traditional FAT AHE Digital FAT (AH-Suite)
Testing Scope Random Sampling (e.g., 10% of packs) 100% Digital Verification of all components
Data Access Paper Reports / PDF Scans Live Cloud Dashboard (AH-Suite)
BMS/EMS Integration Tested at Site (Commissioning) Tested at Factory (Pre-Shipment)
Transparency Manual logs Full digital traceability
Cost Impact Hidden costs in site delays Zero Commissioning Surprises

Trusted by Global Utility Majors

AmpereHour has secured over 3 GWh of assets for clients who demand perfection.

IndiGrid

1st Transmission-connected BESS

Siemens

Port Energy Optimization

BSES Rajdhani

Virtual Power Plant (VPP)

What You Gain

Commissioning confidence before the shipment

Faster project timelines

Lower site troubleshooting costs

Verified compliance with IEC and safety protocols

Complete asset transparency

Bankable performance data

Don’t Let Factory Errors Become Site Problems

Secure your supply chain with 100% digital transparency. Partner with AmpereHour.